Feature Highlight: Line item categories

Introduced configurable categories to help teams organise and track cost and benefit line items independently of the cost hierarchy. Administrators can manage categories and their options, while financial profile editors can assign multiple category values to line items. Find out more: Line item categories.

5.30.0

🚀 New Features

  • Updated Financials activity log entries to show the full line item breadcrumb.

  • Added staffing configuration to Financials.

  • Introduced scenario detail views with a Gantt layout, scenario detail panel, and initiative detail modal.

  • Improved the plan and budget creation modal to make better use of the available space.

🛠 Bug Fixes

  • Fixed pivot table number formatting so zero decimal places are respected and currencies use their configured decimal places.

5.29.2

🚀 New Features

  • Added support for mapping single-select integration fields to multi-select Kiplot fields.

  • Added a Scenarios list page and scenario creation modal.

🛠 Bug Fixes

  • Fixed keyboard navigation in Financials tables so Tab consistently moves to the next cell.

  • Fixed overlapping X-axis labels on Key Result performance charts.

  • Improved the display of long skill names and archived indicators in Resource Demand tables.

  • Improved the Rates configuration table by aligning column headings and simplifying tooltips.

5.29.1

🚀 New Features

  • Added Line Item Categories to Financials configuration, allowing administrators to manage available category values.

  • Included Line Item Category values in financial plans submitted for approval.

🛠 Bug Fixes

  • Fixed pasting values into Financials tables.

  • Improved Resource Demand table layouts for long values.

5.29.0

Feature Highlight: Rate Card Configuration

Introduced new configuration for Rate cards, providing a foundation for managing resource costs more consistently within Kiplot. Find out more: Configure Rates.

5.29.0

🚀 New Features

  • Added created and updated date filtering to the Financial Profiles and Plans APIs.

5.28.4

🚀 New Features

  • Added a new rate card management.

  • Updated Resource Demand views so only initiatives with demand during the selected period are shown.

🛠 Bug Fixes

  • Removed archived entities from Resource Demand assignment dropdowns.

  • Fixed an issue that could prevent costs and benefits from being visible when creating a financial plan.

5.28.3

🚀 New Features

  • Added created and updated date information to the Plans API.

  • Added support for Jira Cloud Atlassian service accounts.

🛠 Bug Fixes

  • Updated Resource Allocation sorting so skills and initiatives are displayed alphabetically.

  • Removed unnecessary over-capacity highlighting where an initiative has no available supply.

  • Corrected the display of Kiplot account names in resource selection.

5.28.2

🚀 New Features

  • Updated Resource Allocation groupings to display the initiative name first when viewing by skill/person or person/skill.

🛠 Bug Fixes

  • Improved the Create Budget modal to make better use of the available screen space.

  • Updated financial plan dropdowns to respect configured terminology.

  • Rounded effort totals shown in the allocation decision modal.

  • Reset the Objective creation form after creating an Objective and improved the display of long Objective names.

5.28.1

🚀 New Features

  • Added Task as a supported type in the Custom Field Export API.

  • Added line item categories to the Financials API.

  • Allowed integration users to update financial data regardless of configured financial locks.

  • Improved the handling of archived entities across Resource Allocation and Resource Demand.

🛠 Bug Fixes

  • Fixed the Financials Activity Review so all nested changes are displayed.

  • Improved alphabetical sorting of people with linked accounts in Resource Allocation.

  • Removed unnecessary “/0” values from the initiative fraction view where no supply exists.

5.28.0

  • Resources: Improved resource assignment and allocation with availability-aware dropdowns, invalid-combination warnings, top-level overview filtering, and refinements across allocation workflows.

  • Financials: Added bulk import, made longer financial timelines easier to navigate, and improved financial value entry and category editing.

Feature Highlight: Guided Resource Assignment and Allocation

It is now easier to assign the right resources. Assignment dropdowns use the team capacity to create clear warnings identify invalid combinations of skills, teams, and people. See Managing resource demand for more.

5.28.0

🚀 New Features

  • Made the timeline on financial profiles scrollable, making longer planning periods easier to navigate.

  • Updated resource assignment dropdowns to take availability into account and warn about invalid skill, team, and person combinations.

🛠 Bug Fixes

  • Restored icons in availability-aware assignment dropdowns and aligned validation messages with configured resource terminology.

5.27.3

🚀 New Features

  • Added bulk import for financial data, reducing manual entry when loading larger volumes of information.

🛠 Bug Fixes

  • Corrected approval dates for users in different time zones.

5.27.2

🚀 New Features

  • Added a Tasks search endpoint to the Export API.

  • Improved resource allocation workflows, including preventing edits to existing resource assignments from being automatically hard allocated.

  • Displayed long-text custom fields at double width for easier reading and editing.

🛠 Bug Fixes

  • Kept trailing zeros after the decimal separator while financial values are being entered.

  • Improved pivot table alignment when group headers wrap onto multiple lines.

5.27.1

🚀 New Features

  • Added top-level filtering and other usability improvements to the Resource Allocation Overview.

🛠 Bug Fixes

  • Ensured recognised users display correctly in resource snapshot previews.

  • Fixed timesheet approval notifications.

  • Restored the ability to clear a financial category.

  • Removed incorrect row borders from pivot tables exported to PowerPoint.

5.27.0

  • Resources: Introduced resource demand approvals and resource allocation for initiatives, making it easier to manage resource requests, approvals, and planning within delivery.

  • Initiative Management: Expanded initiative field visibility controls with configuration by stage and type, showing hidden fields, and refined the initiative detail page experience.

Feature Highlight: Smarter Initiative Configuration with Field Visibility by Type

Configure initiative pages to show only the fields that matter for each type and stage of work. With Field Visibility by Type and Stage, administrators can tailor the information displayed as initiatives progress through their lifecycle and ensuring teams capture the right information at the right time.

Feature Highlight: Resource Demand and Allocation

Take greater control of capacity planning with Resource Demand. Teams can now raise resource requests, route them through an approval process, and compare planned demand against available capacity before work is committed.

By managing resource requests centrally and providing a clear supply-versus-demand view, organisations can identify capacity gaps earlier, make more informed allocation decisions, and ensure the right people are assigned to the highest priority initiatives.

5.27.0

🚀 New Features

  • Introduced resource demand approvals.

  • Improved the initiative detail page by revealing eligible hidden fields, reordering tabs, and adding the option to hide the Delivery tab.

  • Prevented initiatives from being moved to invalid lifecycle stages on the Portfolio Kanban board.

  • Added the ability to reorder skill classifications.

5.26.3

🚀 New Features

  • Added a Portfolio Kanban filter to display initiative lifecycle stages by type.

🛠 Bug Fixes

  • Added the required deployment check for the AI Lessons Learned feature.

  • Fixed resource assignments displaying "Unknown" for users with accounts.

5.26.2

🚀 New Features

  • Added created and updated date filters to the Initiatives export.

🛠 Bug Fixes

  • Fixed single-select tag custom field options not disabling correctly.

  • Resolved an issue preventing Azure DevOps integration credentials from being updated.

  • Fixed resource managers being unable to add or edit resource demand when workflows were disabled.

5.26.1

🚀 New Features

  • Added support for configuring initiative field visibility by stage and type.

  • Automatically hide fields, sections, and tabs that are not relevant to an initiative's stage or type.

  • Added support for resource allocations on initiatives.

  • Introduced skill classification support within resource allocation and across skills tables and dropdowns.

  • Added highlighting of differences on multi-currency financial profiles.

🛠 Bug Fixes

  • Fixed editing all periods for newly created resources within transactions.

5.26.0

  • Financial Profiles: Added the ability to convert financial line item rows into another currency and made it clearer which plan or budget is being copied when creating a new financial plan.

  • Activity Logs: Improved activity log readability by converting financial ID values into names and rendering product and customer names when those fields are updated on initiatives and outcomes.

Feature Highlight: Multi-currency financial profiles

Teams can now manage financial profiles that include costs in different currencies, without having to manually standardise everything before entering it into Kiplot. This makes it easier to work with international suppliers, regional budgets, and cross-border programmes while keeping financial data accurate and consistent. Kiplot handles the currency conversion for reporting totals, helping teams compare costs clearly while still preserving the original values that were entered. Find out more: Multiple currencies in financial profiles.

5.26.0

🛠 Bug Fixes

  • Converted ID values into readable names in the Financials Activity Log.

  • Updated bulk sync and activity table labels so they match the relevant integration type.

5.25.3

🛠 Bug Fixes

  • Updated outcome dependency descriptions so they correctly respect outcome terminology.

5.25.2

🚀 New Features

  • Added the ability to convert a financial line item row into another currency on a financial profile.

  • Added a chart setting to hide the Y-axis label in visualizations.

🛠 Bug Fixes

  • Updated initiative prioritization immediately when job size changes.

  • Corrected the description for start-to-start outcome dependencies.

  • Ensured markdown group values render correctly in pivot tables.

5.25.1

🚀 New Features

  • Added the ability to see the plan or budget being copied from when creating a new financial plan.

🛠 Bug Fixes

  • Ensured padding is maintained on entity keys.

April 2026

  • Archive Management: Introduced archive management for risks, issues, and assumptions to support the archiving workflow.

  • Financial Profiles: Added support for archiving financial profiles and creating plans and budgets across multiple currencies.

  • Tasks: Added a Tasks tab to outcome details and prevented tasks from archived outcomes appearing incorrectly.

  • Integrations: Improved the Add Integration page with clearer field names and Azure DevOps icon visibility on integration detail pages.

Feature Highlight: Restoring RAID items

Users can now archive and restore risks, issues, and assumptions - helping teams keep active RAID registers focused while still retaining access to historical or inactive items when needed. These changes make it easier to manage RAID data over time without permanently removing important context. Find out more: Manage RAID

5.25.0

🛠 Bug Fixes

  • Fixed missing code generation so customers and products can be edited correctly.

  • Fixed long values overflowing in the Key Dates table view on initiatives.

  • Fixed the Outcome Type configuration screen so it scrolls correctly within its container.

5.24.3

🚀 New Features

  • Introduced archive management for risks, issues, and assumptions.

🛠 Bug Fixes

  • Added overflow handling for IRR calculations in financials.

  • Prevented modal windows from scrolling content behind the modal.

5.24.2

🚀 New Features

  • Added support for archiving financial profiles.

  • Added the ability to create plans and budgets on financial profiles with multiple currencies.

  • Added a Tasks tab to outcome details.

5.24.1

🚀 New Features

  • Added support for multiple currencies on financial profiles.

  • Improved financial line item data to indicate when an item has an archived ancestor.

🛠 Bug Fixes

  • Renamed fields on the 'Add Integration' page and displayed the Azure DevOps icon next to selected integrations on detail pages.

March 2026

  • Tasks: Added task planning initiatives to support better planning and tracking.

  • Exports & Configuration: Added new export APIs for assumptions and lessons learned and improved filtering and sorting in key list views.

  • UI & Usability: Delivered a broad set of usability improvements across custom fields, date handling, permissions, and layout consistency.

Feature Highlight: Task Planner

This release cycle focused heavily on building out task management across initiatives and outcomes. Users can now manage work more effectively with dedicated task tables, custom fields on tasks, and improved usability across the UI - making it easier to plan, track, and execute work at a more granular level. Find out more: Task Planner

5.24.0

🛠 Bug Fixes

  • Fixed excessive memory consumption in XLSX downloads.

  • Fixed an error when changing outcome start or end dates in certain non-UTC matching time zones.

5.23.4

🛠 Bug Fixes

  • Show the correct buttons for partially approved approvals.

  • Fixed system list tag mode and integration handling for entity sections.

  • Prevented period dropdowns from jumping when opened.

5.23.3

🚀 New Features

  • Ensured restore icons only appear when a restricted user has permission to restore the item.

🛠 Bug Fixes

  • Improved alignment and unsaved-change handling for custom fields, including markdown editors.

  • Made the full key readable when the integration lens is selected in the outcome planner.

5.23.2

🚀 New Features

  • Added assumptions export APIs.

  • Added the initiative task table with custom fields.

  • Ensured created-at is shown in the plan and budget dropdown on the financial profile.

  • Upgraded custom delivery fields to the new markdown editor and added toggle-able checkboxes.

🛠 Bug Fixes

  • Fixed long ADF text custom fields so continuous strings wrap correctly.

5.23.1

🚀 New Features

  • Added lessons learned export APIs.

  • Improved visibility of the most recent plan when pre-populating plan data.

  • Added an info tip on initiative and outcome contributions in OKRs.

🛠 Bug Fixes

  • Vertically centred the key date content columns on initiative pages.

February 2026

  • Custom Fields: Introduced custom fields for Objectives and Key Results.

  • AI: Expanded AI Insights with Executive Summary and improved modal experiences.

  • Initiative Roadmap: Added sub-business-unit filtering to the initiative roadmap.

  • Dependencies: Improved visibility of key dates within dependencies.

  • Activity & Audit: Expanded activity logs with entity keys across RAIDs, financials, and lessons learned for clearer traceability.

5.23.0

🚀 New Features

  • Added custom fields for Objectives and Key Results.

  • Displayed key dates, including start and end dates, within the dependencies block.

  • Added sub-business-unit filtering to the initiative roadmap.

🛠 Bug Fixes

  • Ensured financial profiles can be directly shared with users.

5.22.3

🚀 New Features

  • Expanded activity logs to include entity keys across RAIDs, financials, and lessons learned.

5.22.2

🚀 New Features

  • Allowed restricted users to archive initiatives and outcomes where they have permission.

  • Expanded activity logs to include entity keys across RAIDs, financials, and lessons learned.

🛠 Bug Fixes

  • Updated export endpoints to support custom fields for Objectives, Key Results, Lessons Learned, and Assumptions.

  • Fixed incorrect status field sizing when no text is present.

5.22.1

🚀 New Features

  • Introduced the Executive Summary AI Insight for initiatives.

  • Added the ability to recover deleted plan and budget data in Financials.

  • Enabled editing of theme and type configuration values for RAIDs and Lessons Learned.

  • Added a success indicator when completing tasks within AI modals.

🛠 Bug Fixes

  • Fixed missing styles in risk probability and impact configuration tables.

  • Aligned measures description correctly with table headers.

January 2026

  • AI: Introduced AI insights to identify initiative risks and suggest relevant lessons learned; improved insight stability and observability.

  • Initiatives: Added configurable themes, types, and custom fields for lessons learned and assumptions; enabled assumption creation directly on initiatives; improved restricted-user archival behaviour.

  • OKRs: Enhanced key result graphs with legends, hover tooltips, and actuals lines; improved summary visibility and contribution handling; resolved multiple review and archived-editing issues.

  • Export & Integrations: Added export APIs for OKRs, integrations, and linked items; improved archived filtering and integration export data accuracy.

Feature Highlight: Kiplot AI – Risk & Delivery Intelligence

  • Generate Risks from Lessons Learned
    Automatically surfaces relevant past lessons when starting an initiative and converts them into suggested risks - helping you reuse organisational knowledge and avoid repeat mistakes. For more information, see Kiplot AI: Learning from lessons learned.

  • AI Risk Identification
    Proactively analyzes initiative details, financials, delivery data, and outcomes to suggest tailored risks for review and refinement before adding them to your RAID log. For more information see Kiplot AI: Risk Identification.

  • Delivery Update Generation
    Instantly drafts structured stakeholder updates based on live initiative data, including financials, risks, RAG statuses, and timelines - fully editable before saving. For more information see Kiplot AI: Delivery Update Generation.

5.22.0

🚀 New Features

  • Added the Suggested Lessons Learned AI insight.

  • Added configurable themes and types for lessons learned and assumptions.

  • Improved list item archival behaviour for restricted users.

  • Moved RAID configuration into its own tab.

🛠 Bug Fixes

  • Fixed archived filtering for lifecycle stage search exports.

5.21.2

🚀 New Features

  • Added custom fields for lessons learned and assumptions.

  • Added an activity log for assumption events.

  • Added legends and hover tooltips to key result graphs.

5.21.1

🚀 New Features

  • Added the Identify Initiative Risks AI insight.

  • Enabled creating assumptions directly on initiatives.

  • Added an actuals line to key result graphs.

  • Included all initiatives and outcomes in key result summaries, even without linked data.

  • Allow prioritisation without a job size.

🛠 Bug Fixes

  • Fixed alignment issues in Budgets & Plans lists.

5.21.0

🚀 New Features

  • Added export APIs for OKRs, integrations, and linked items.

  • Enabled lessons learned on initiatives.

🛠 Bug Fixes

  • Fixed assigning archived key results to objectives.

December 2025

  • OKRs: Added actuals support across Key Results, Initiatives, and Outcomes, including fixed-date handling, overview tables, and improved data presentation.

  • UI & Usability: Resolved layout and navigation issues, and improved reliability of creation flows across devices.

Feature Highlight: OKRs Enhancements

We’ve enhanced OKRs with full Actual tracking and support for both attributed and unattributed contributions to Key Results.

Key Results now support cumulative Plan, Forecast, and Actual views, giving teams a clear, time-based picture of intended progress, expected outcomes, and real performance.

  • Attributed contributions: Record forecast and actual impact at the initiative or outcome level. Forecast dates automatically adjust if delivery shifts, keeping projections realistic.

  • Unattributed contributions: Update Key Results directly with overall forecast or actual totals when initiative-level attribution isn’t available.

This provides flexible tracking for teams at any level of measurement maturity - while maintaining a clear, auditable path from strategy to execution.

Fore more information see Objectives Key Results (OKRs).

5.20.4

🛠 Bug Fixes

  • Resolved feedback-driven issues and bugs in the OKR experience following recent reviews.

5.20.3

🚀 New Features

  • Added initiative and outcome actuals directly to the Key Result page for better progress visibility.

🛠 Bug Fixes

  • Fixed percentage values in Key Result plan rows.

  • Resolved an issue preventing Key Result creation on smaller screens.

5.20.2

🛠 Bug Fixes

  • Updated the Key Results table UI based on customer feedback to improve clarity and usability.

5.20.1

🚀 New Features

  • Ensured Key Result plans, forecasts, and actuals consistently use fixed dates.

  • Added Key Result actuals to Initiative and Outcome detail pages.

🛠 Bug Fixes

  • Fixed issues with UI ordering and navigation across outcomes and integrations.

5.20.0

🚀 New Features

  • Introduced an overview table on the Key Results page to summarise performance at a glance.

  • Allowed assigning active or archived Key Results to archived contributions.

🛠 Bug Fixes

  • Removed visual gaps and layout issues on Outcome and Initiative detail pages.

  • Fixed loading and navigation issues across Initiatives, Teams, and Financial inputs.

November 2025

  • OKRs: Introduced the refreshed Objectives, Initiatives, and Key Results interface, including the new Key Results tab and support for currency measures.

  • Integrations: Added Epic Link syncing for outcomes and initiatives, expanding Jira integration capability.

  • Export: Added department data to team exports and sub-business-unit identifiers to initiative exports, improving downstream reporting accuracy.

5.19.3

🚀 New Features

  • Enabled the Epic Link field for outcomes and initiatives when syncing with Jira.

🛠 Bug Fixes

  • Ensured text wraps correctly in pivot table cells.

  • Added sticky navigation to the Activity Log sidebar.

  • Added max-length validation to financial line-item values.

5.19.2

🚀 New Features

  • Added department information to the Search Teams export.

  • Introduced grouping of business units via sub-business units.

🛠 Bug Fixes

  • Fixed failure to delete integration instances.

  • Corrected generation of “Maintain OKR” titles.

5.19.1

🚀 New Features

  • Users with multiple financial profiles can now create non-financial approval requests.

  • Added the ability to add forecasts directly to Key Results.

🛠 Bug Fixes

  • Fixed incorrect unlinking of outcomes and initiatives during sync operations.

5.19.0

🚀 New Features

  • Updated the Objective, Initiative, and Key Results detail pages to the new UI.

  • Added the new Key Results tab to initiatives and objectives.

  • Added support for currency measures in OKRs configuration.

  • Added sub-business-unit ID to the Search Initiatives export.

🛠 Bug Fixes

  • Fixed multiple locations incorrectly displaying archived items.

  • Corrected state updates after adding a new outcome.

October 2025

  • Export: Improved filtering for archived capacity data.

  • OKRs: Added calendar button to select expected date realised initiative and outcome pages; introduced support for currency unit types and starting values; improved plan entry deletion and percentage input.

Feature Highlight: Initiative and Outcome's contributions to Key Results - expected date realised

Week of October 25, 2025 (5.18.3)

🚀 New Features

Initiatives

  • Added sub-business unit name sort order for initiative search.

OKRs

  • Added a calendar button to select expected date realised Outcome and Initiative pages.

UI

  • Added business unit to the sub-business unit filter selector.

🛠 Bug Fixes

Export

  • Fixed isArchived filter for Teams’ capacities and reserved capacities APIs.

Initiatives & Outcomes

  • Fixed issues with removing teams from estimates.

  • Hidden period estimates for single-period items.

  • Improved sticky table behaviour for large screens and resolved several visual issues.

OKRs

  • Users can now delete plan entries and set plan percentage values.

Reports

  • Ensured report title input and placeholder display correctly when empty.

Week of October 20, 2025 (5.18.2)

🚀 New Features

Business Units

  • Added pagination to the Business Unit Initiatives section.

OKRs

  • Added currency unit type to measures.

  • Users can now add a starting value to OKRs.

🛠 Bug Fixes

  • Fixed display of long measure names.

Week of October 10, 2025 (5.18.1)

🛠 Bug Fixes

Export

  • Fixed period and entity lifecycle search endpoints and added automated tests.

Financials

  • Ensured line item values display correctly when navigating financial years.

  • Fixed reset behaviour for preserved changes.

UI & Strategy

  • Fixed visual regressions on the Portfolio Kanban and integration configuration screens.

Week of October 3, 2025 (5.18.0)

🛠 Bug Fixes

  • Fixed display of long names across OKRs, Initiatives, Outcomes, Teams, and Business Units.

September 2025

Feature Highlight: Create plans or budgets from existing data

Create a new financial plan or budget and pre-populate it with existing financial data. Configure the plan or budget by selecting financial data types and defining date ranges for pre-population, then finalize its creation.

Week of September 30, 2025 (5.17.4)

🚀 New Features

Financials

  • Create a plan or budget from existing data.

  • Separate cost and benefit locks on financial tables.

Filters & Operating Model

  • Add sub-business unit filters to Initiative, Outcome, and Team list pages.

  • New search API for sub-business units.

🛠 Bug Fixes

Financials

  • Fixed inconsistent filter behaviour when adjustments are added.

  • Improved UX for plan and budget creation.

  • Paginate goals on initiative roadmaps.

  • Added visibility message when all financial data is hidden by filters.

Initiatives & Outcomes

  • Restricted users now see “Restricted” where they lack access instead of blank fields.

  • Fixed read/write sync buttons appearing disabled incorrectly.

Export

  • Prevented API failures when teams have no capacity data.

Week of September 19, 2025 (5.17.3)

🚀 New Features

  • Added APIs for listing accounts, persons, skills, and team capacities.

  • Automatically show adjustments when added to cost items.

  • Restricted users can now access OKRs shared with them.

  • Fuzzy search added to “Add Team Capacity” modal.

🛠 Bug Fixes

  • Fixed pasting values containing currency symbols.

  • Resolved sticky header issue in financial tables.

  • Search boxes now appear when no results are found.

Week of September 16, 2025 (5.17.2)

🚀 New Features

Approvals

  • Added approval state icons, new tabs, and fields for product and customer.

Financials

  • Improved clarity for deleted line items in plans.

Initiatives, Outcomes & Teams

  • Added sub-business unit filter.

  • Added fuzzy search to “Add Estimate” modals.

OKRs

  • Restricted users can update shared objectives and key results.

  • Indication when results are filtered out for restricted users.

Visualisations

  • Bar and column charts now respect subgroup ordering.

🛠 Bug Fixes

  • Fixed pagination logic in the export APIs.

  • Fixed workspace settings layout and editor button spacing.

  • Fixed OPA bypass via ID filtering.

  • Ensured correct restricted user data handling.

Week of September 5, 2025 (5.17.1)

🚀 New Features

  • Added approval status to initiative query APIs.

  • Implemented all remaining export APIs for outcomes, initiatives, and dependencies.

  • Added percentage breakdown option for donut charts.

🛠 Bug Fixes

  • Updated restricted user access for initiative summaries and updates.

  • Fixed kanban movement requiring page refresh.

  • Improved database migration reliability and Jira integration.

August 2025

  • Approvals: Existing plans and budgets can be used in approval requests; improved the UI in the activity log, configuration, and list views.

  • Financials: Lock budgets and plans in the financial profile; improved cost and benefit hierarchy search.

  • Restricted Users: Restricted users can now use the Outcome Planner

  • Reporting: Conditional formatting, improved chart readability, custom colours, blanks handled as zero.

  • Capacity Planning: Improved the search skill search; keyboard navigation for estimates;

Week of August 29, 2025 (5.17.0)

🚀 New Features

Approvals

  • Approval request-related fields now display correctly in the Activity Log

  • Users can link an existing plan or budget when creating an approval request

Visualisations

  • Added conditional formatting for specific columns in tables and pivot tables

  • Improved readability of labels on column charts

  • Increased the width of dependency and link lines on charts

  • Removed unnecessary aggregations (sum/mean/min/max) from chart labels

  • Added the ability to set default and custom colours for uniform values

🛠 Bug Fixes

Integration

  • Fixed issue where read and write sync buttons stayed greyed out after creating a sync

  • Corrected terminology issues when applying Kiplot field names

Reports

  • Closing a side panel now works correctly when discarding changes and removing an active tile

Visualisations

  • Blank values are now treated as zero when ordering data points

Week of August 22, 2025 (5.16.3)

🚀 New Features

Approvals

  • Refactored the approval definition configuration page for improved UI performance

🛠 Bug Fixes

Integration

  • Fixed Jira team field syncing for instances with more than 100 teams

Visualisations

  • Currency symbols have been moved from axis ticks to labels to prevent overlap

Week of August 18, 2025 (5.16.2)

🚀 New Features

Approvals

  • Approvals list view updated to include requester and approval date

🛠 Bug Fixes

Financials

  • Corrected payback period and return on investment calculations in certain scenarios

OKRs

  • Paginated the measures shown on the configuration page

  • Paginated the OKRs shown on the Objectives page

Week of August 11, 2025 (5.16.1)

🚀 New Features

Financials

  • Added the ability to lock budget and plan creation

Initiatives & Outcomes

  • Introduced keyboard navigation when adding resource estimates

🛠 Bug Fixes

Approvals

  • Prevented financial approval request creation if no financial profile exists

Week of August 4, 2025 (5.16.0)

🚀 New Features

Search functionality

  • Improved cost hierarchy search in financial profiles to display parent and child items

  • Added support for boolean search in Skills search

Outcome Planning

  • Restricted users can now use the Outcome Planner

🛠 Bug Fixes

Financials

  • Fixed payback calculation errors when actuals exist before forecasts

Reports

  • Navigating to a non-existent report now shows a “not found” message instead of an error

UI

  • Fixed overlapping cost item names in the financial profile

  • Corrected the size of the warning icon in the financial profile

  • Removed unnecessary vertical whitespace in boxes

July

Week of July 29, 2025 (5.15.3)

🚀 New Features

Approvals

  • Approval information added to the Plans dropdown section, Plan selection display value and Plans list

OKRs

  • The Business Unit ID is now available on Objectives and Key Results

Financials

  • Updated Financial Activity Review page to accommodate multiple financial profiles

  • UI updates to the lock icon within financial profiles

  • Financial terminology updates

  • Headers and key columns in the financials table are now sticky and will be visible even if users scroll down

Initiative Roadmap & Portfolio Kanban

  • Restricted users can now access Initiative Roadmap and Portfolio Kanban. Restricted users will only be able to see outcomes belonging to the initiatives the user has access to

🛠 Bug Fixes

Configuration

  • Fixed issue where not all options in long field lists were visible

Initiatives

  • Fixed bug where estimates couldn’t be entered beyond 20 periods from the start date

Teams

  • Improved performance of team capacity loading with large number of values

Visualizations

  • Improved handling of grouping by null/undefined on pivot tables

Week of July 18, 2025 (5.15.2)

🚀 New Features

Financials

  • Added ability to lock Budget and Plan creation

  • Added error message text for failed financial profile sharing

  • Prevented benefits from displaying in red when over budget or plan

  • Alphabetized Financial Profile list in Financials tab

🛠 Bug Fixes

Financials

  • Added CapEx validation warnings

Integration

  • Jira write to Kiplot fields are now writable as expected

Visualizations

  • Improved display of empty values, currency formatting, and markdown overflow

Week of July 11, 2025 (5.15.1)

🚀 New Features

Approvals

  • Added new APIs for approval request creation

Financials

  • Enabled keyboard navigation in Financials table

Integration

  • Added webhook security support for Jira Cloud

Reports

  • Introduced simple caching for fetching dataset entities

Visualizations

  • Enabled styled titles by default on new tiles

  • Right-aligned numeric values in tables

🛠 Bug Fixes

  • Updated UI for scatter plot and heatmap graphs

June

Week of June 27, 2025 (5.14.3)

🚀 New Features

Financials

  • Added locks for budget and external reference fields and display lock indicators in UI

Multiple Financial Profiles

  • Ability to list and create multiple financial profiles

    • Multiple Financial Profiles allows users to have multiple financial profiles that contribute to a single initiative (ADD LINK)

🛠 Bug Fixes

  • Corrected typo in start-to-start dependency description on initiatives and outcomes

Week of June 20, 2025 (5.14.2)

🚀 New Features

Financials

  • Budgets can now be made configurable within Kiplot configuration. Users can enable or disable Budgets.

Creating Plans from Scratch

  • Users no longer need to save a forecast in order to save a plan

  • Users can now save down a plan independently from forecasts

Integration

  • Added Azure DevOps field mapping between Kiplot team field and area work item field

Portfolio Kanban

  • Restricted users can now use the portfolio Kanban board

Week of June 13, 2025 (5.14.1)

🚀 New Features

Financials

  • Refactored financials table to support multiple lines on initiative detail pages

Week of June 6, 2025 (5.14.0)

🚀 New Features

Integration

  • Integration instance controls added to configuration page for Azure DevOps integrations

🛠 Bug Fixes

  • Enabled download of Financials Activity Review

May

Week of May 23, 2025 (5.13.3)

🚀 New Features

Financials - Events of users changing line item definitions are now recorded on the financial activity review page

Integration - Support added for mapping between Outcome Delivery Status and Azure DevOps work item state

🛠 Bug Fixes

  • Write sync fix for Jira team field mapping

Week of May 16, 2025 (5.13.2)

🚀 New Features

Financials

  • Create page for Financials Activity Review for Portfolio (accessible via URL)

  • Record events of users deleting line items on the activity review

Week of May 9, 2025 (5.13.1)

🚀 New Features

Initiative Roadmap - Key dates are now taken into account when calculating an initiative's effective start and end dates

Risks & Issues - Ability to remove probability and impact scoring in configuration

Users Excel Export - Account information is included when downloading strategic portfolio roles from Manage Users, and deleted accounts will no longer part of the extract

🛠 Bug Fixes

  • Fix sliders handling of 0% probability and out-of-range impact

  • Rebalance boundary values when adding/removing probability level

Week of May 2, 2025 (5.13.0)

🚀 New Features

Initiative Roadmap - Initiatives are now ordered by effective start and end periods

✨ Enhancements

Risks & Issues - Improved long text and custom field input experience

🛠 Bug Fixes

  • Fixed validation and ability to revert value when updating estimates (skill, person, or team)

April

Week of April 25, 2025 (5.12.1)

✨ Enhancements

Financial Activity Review

  • "None" values now display as "(empty)" in Financials Activity Review

  • Updated styling of the Financials Activity Review

Risks & Issues Enhancements

  • Ability to add custom fields to Risks and Issues

  • Impact and Probability scoring scales can now be configured in Kiplot configuration

Week of April 4, 2025 (5.12.0)

🚀 New Features

Financial Activity Review Log

  • A consolidated financial activity review section is now available on Business Unit detail pages

  • The financial activity review data is downloadable from the Business Unit detail pages

March

Week of March 28, 2025 (5.11.4)

🚀 New Features

Financials Lock Feature

  • Admins can now lock budgets, forecasts, and actuals across all Financial Profiles. While locked, no users—regardless of permissions—can modify financial data until the lock is lifted in configuration

Initiative Estimation

  • Kiplot now supports Team, Person, and Period level estimation on an Initiative

✨ Enhancements

Approvals Workflows

  • UX improvements implemented for approval workflows

Auditability for Financials

  • Audit logging added for configuration changes in Financials

Error Messages on Financials

  • Users now see detailed error messages if saving financial line items fails

Team Capacity Display

  • The team capacity view now shows the current month as the second column when loading the page

User Management

  • Users can now be searched by email on the Manage Users list

🛠 Various Fixes:

  • Renamed Financial Profile external reference field in field mappings

Week of March 21, 2025 (5.11.3)

✨ Enhancements

Improved Error Page Behavior

  • 404 page links now respect user context and permissions

🛠 Various Fixes:

  • Terminology-based search now works in Approvals configuration dropdowns

  • Dependencies no longer render behind Outcomes/Initiatives

Week of March 14, 2025 (5.11.2)

🚀 New Features

Integration with External Reference Field

  • Kiplot now supports integration with the External Reference field in Financials

Integration with Jira Priority Field

  • Kiplot now supports integration with the Jira Priority field

  • This can be mapped to Kiplot’s Prioritization Score field

Integration with Jira Labels Field

  • The Jira Labels field can now be integrated and mapped to a multi-select list type custom field in Kiplot

✨ Enhancements

Initiative Roadmap Filtera

  • Added filters for Product and Customer

Initiative Roadmap Validation Messages

  • Not-allowed cursor now appears when dragging to invalid parent targets

Create User UI

  • Asterisk now shown on required fields in Create User modal

  • Improved error messaging in user creation flow

🛠 Various Fixes:

  • Users who are shared on Initiatives and have access to Financials can now view the Financial Activity Log

  • Email casing can now be updated in the People list

Week of March 7, 2025 (5.11.1)

✨ Enhancements

Initiatives and Outcomes Entry

  • Users can now press Enter to add value forecasts

Exporting Reports

  • Users can now export all pages of a report to PowerPoint

🛠 Various Fixes:

  • Capitalization changes now respected for Custom Field list option names

  • Fixed error when triggering a Bulk Create for all Jira issues

February

Week of February 28, 2025 (5.11.0)

Improved Filtering and Display Options on the Initiative Roadmap

  • Users can now filter the Initiative Roadmap by Product and Customer system fields

Updated default swim lane on the Initiative Roadmap

  • The Team Swimlane is now the default swim lane option for Outcomes on the Initiative Roadmap

Outcome Initiative Field Mapping Support for Azure DevOps

  • The Outcome Initiative field can now be mapped in Azure DevOps integrations

Timesheets Enhancements

  • Users can now pin activities in the My Timesheet view for easier access

Updated Financials User Description

  • Clarified the financials user role description to better match actual permissions

  • Financial Users can view financial data for portfolio items that the user can access. Can edit financial data for portfolio items that the user can edit

Various Fixes:

  • Clicking a Financials field without making changes no longer logs an event in the financials activity log

  • Improved UX for Financials input fields

  • Members and Restricted Members can now update Key Dates on Initiatives they have access to

  • Users can now download historic data from the Time Machine menu

Week of February 21, 2025 (5.10.3)

Custom Field Configuration Enhancements

  • The Manage Options modal now automatically repositions to stay fully visible on the screen in all instances

Initiative Roadmap Improvements

  • Business Unit can now be used as a swim lane for outcomes on the Initiative Roadmap

Business Unit UI Enhancements

  • Archived Sub-Business Units are now filtered out for read-only users

Various Fixes:

  • Archived initiatives no longer appear under Business Units

  • Jira Cloud webhooks now send rich text as ADF instead of WikiMarkup

Week of February 14, 2025 (5.10.2)

Azure DevOps Integration Enhancements

  • Support added for picklist and identity fields

Table UI Improvements

  • Validation errors within table cells now display only inside the affected cell, without impacting sibling cells

  • The error message length is not restricted by the width of the parent field

Various Fixes:

  • Terminology now respected in Approval dropdowns in Configuration

  • Zero values now show correctly in Financials totals

  • Improved modal sharing performance with large user lists

Week of February 7, 2025 (5.10.1)

Improvements for Running Bulk Activities

  • Users can now use checkboxes to easily select the full scope needed for bulk operations

Field Mapping Enhancements for Integrations

  • Disabled fields are now clearly labeled with a tag in the Integration Field Mappings view

  • Improved messaging when unknown Jira fields are encountered

Security Enhancements

  • UI now respects Restricted Users’ permissions

  • Users can share Business Units with other accounts

January

Week of January 31, 2025 (5.10.0)

Improved Filter Functionality on Integration Sync Activity Log

  • Users will now be able to filter on the the sync logs within a sync job activity

New JQL Filter on Bulk Create Modal

  • A JQL filter is now available for users to use at the point of bulk-creating items

Week of January 24, 2025 (5.9.3)

New List Page and Functionality for Business Units

  • Users can now access the Business Units list page from the navigation panel. In a Business Unit modal, they can view associated initiatives, add new ones, share the Business Unit with a user, and create sub-Business Units

  • Users are no longer required to update Business Units from the Configuration section in Kiplot

Week of January 17, 2025 (5.9.2)

Various Fixes:

  • In the reporting settings for a visual chart, the label decimal places setting will now be respected when the ‘Show Percentage’ option is enabled

Week of January 10, 2025 (5.9.1)

Improved handling of disabled Kiplot fields within integrations

  • On the integrations page and within the field mappings, users can now see which fields have been disabled

Week of January 3, 2025 (5.9.0)

  • Improved outcome dependencies section on an Initiative

Various Fixes:

  • Users will no longer encounter an error when accessing the financial profile of an initiative they have been granted access to

December

Week of December 20, 2024 (v5.8.3)

Improved handling of Linked Entities in Kiplot during Bulk Creation

  • During the bulk creation process, if initiatives or outcomes already linked in Kiplot under a different integration are selected for creation in a new project, Kiplot will automatically reassign these entities to the updated project.

  • Item keys in Kiplot will be updated to align with the corresponding keys in Jira

Week of December 13, 2024 (v5.8.2)

Enhanced sorting on the Initiative Roadmap

  • On the initiative roadmap, initiatives within a swimlane are now sorted in this order: start date, end date, and then name

  • Outcomes within an initiative, and the optional team swimlanes, are sorted in the same order: start date, end date, and then name

Enhanced Broken Dependency Tooltip

  • Hovering over a broken dependency icon on an initiative or outcome now displays a tooltip explaining the reason for the broken dependency

  • This feature is available on the initiative roadmap and the outcome planning page

Ability to integrate with ‘Assignee’ field in Jira

  • Kiplot now integrates with the ‘Assignee’ field in Jira

  • This can be set up within the integrations page in the configuration section in Kiplot

Enhanced ability to manage estimates between Kiplot and Jira

  • Users can now experience improved management of estimate synchronization between Kiplot and Jira, provided that this is set up within integrations

  • (Read) If no effort values are specified in Kiplot, a generic skill will be created, and the effort will be recorded as the total value

  • (Write) If Kiplot has only a generic effort value, this value will be written as the total effort in Jira

Kiplot URL Automatically Populated Upon Item Creation

  • When the fields Kiplot Initiative URL, Outcome URL, or Outcome Initiative URL are configured in your integration field mappings to write to Jira, they will now automatically populate the corresponding Jira fields upon item creation in Kiplot. Users no longer need to wait for a write sync for the URLs to appear in Jira.

Week of December 6, 2024 (v5.8.1)

Ability to add Value Forecast entries as percentages (%)

  • Users can now input value plan entries as percentages within the OKRs section in Kiplot

  • To use percentages as a unit, ensure it is enabled for the specific measure defined in the OKRs configuration page

Enhanced Dependency Resolution Strategy

  • Users now have access to dependency resolution options in the 'Dependency Resolution' section, available under the More menu on both the initiative roadmap and outcome planning pages

November

Week of November 29, 2024 (v5.8.0)

Separation of Bulk Sync and Bulk Create workflows

  • Users will now enjoy an improved bulk operation experience with the implementation of separate user flows for Bulk Sync and Bulk Create

Various Fixes:

  • Usernames that start or end with a whitespace will now be processed successfully

Week of November 22, 2024 (v5.7.2)

Various Fixes:

  • Users with accounts created through user management will be able to successfully log in to Kiplot using SSO

Week of November 15, 2024 (v5.7.1)

Improved avatar UI

  • Users will now experience a greater variety of background colours and improved styling for initials displayed in user avatars

Ability to assign white as a colour to Types in Kiplot

  • Users can now assign white as a colour to a Type in Kiplot, whether on an outcome or an initiative

  • This will be represented when relevant lenses are turned on on the initiative roadmap, portfolio kanban and the outcome planning page

Improved issue handling for issuetype and project changes

  • Kiplot now automatically updates issue types when they change in Jira (e.g., from Outcome to Initiative), provided the destination issue type is already configured in Kiplot

  • When issues are moved to a different project in Jira, Kiplot will update the issue accordingly, as long as the destination project is configured in Kiplot

Week of November 8, 2024 (v5.7.0)

Improved user journey to add a person to People list in configuration

  • Users can now search for people by name or email in the People section in configuration, provided names are configured

Prioritization score lens available on the initiative roadmap

  • The ‘Prioritization Score’ lens can now be applied to the initiative roadmap, color-coding the left-hand section of each initiative block based on its prioritization category

Ability to assign the business unit of a new outcome directly from the initiative detail page at the time of outcome creation

  • When creating a new outcome from the initiative detail page, users can now assign the outcome to a business unit directly within the create modal

Week of November 1, 2024 (v5.6.4)

Ability to click on key dates for more information

  • Users can now click on a key date in the initiative roadmap or activity log to navigate directly to the key dates section in the initiative modal

View of RAG Status Icon on Key Date RAG Status

  • Users will now see a RAG Status icon in front of label names on the RAG Status of a key date. This icon will be visible when the RAG Status is displayed and while selecting a RAG Status.

Improved tooltip messages and an enhanced dependencies section

  • Users will now benefit from clearer tooltip messages for dependencies on the initiative roadmap and outcome planning pages

  • The dependencies section on initiatives and outcomes has been improved to enhance usability

Enhanced consistency for lens names on the initiative roadmap, portfolio kanban and outcome planning pages

Ability to sort outcomes on the initiative modal page

  • Users can now sort outcomes by clicking on the column names in the outcomes section of an initiative’s modal page

Ability to add email addresses against names (People)

  • Admins can now add email addresses for names in the People section under Configuration. If a person is linked to an existing Kiplot account, the associated email will be displayed, making the email property uneditable

Ability to rename Kiplot ‘Owner’ field

  • The ‘Owner’ field is now available on the terminology page in Configuration, allowing users to rename the field as required by the business

  • To locate the 'Owner' field, select Add term and search for Owner

Various Fixes:

  • The People page in Configuration now sorts all entries alphanumerically, including those connected to existing accounts

October

Week of October 25, 2024 (v5.6.3)

Ability to reset prioritization score component to “not set”

  • On an initiative, users can now reset a previously assigned prioritization component score to its default “not set” state

Ability to specify your OKR measure to be a Number or Percentage

Week of October 18, 2024 (v5.6.2)

Drag and drop outcomes to no team swimlanes

  • Users can now create an outcome without a team on the initiative roadmap and the outcome will be represented under the initiative’s ‘No Team’ swimlane. Users can drag and drop the outcome within the swimlane

Various Fixes:

Week of October 11, 2024 (v5.6.1)

Bulk create read of Initiatives/Outcomes

  • Kiplot Administrators can now bulk create entities from Jira in Kiplot and sync them seamlessly within the same workflow.

Week of October 4, 2024 (v5.6.0)

Bulk read and write of Initiatives/Outcomes

  • Kiplot Administrators can now perform bulk read and write actions from the integrations page in configuration. This new feature allows users to efficiently sync data with Jira.

September

30 September, 2024 (v5.5.4)

New system fields: Product and Customer

  • Product and Customer fields are now available as system fields on the information section of Initiatives and Outcomes. Use the Custom Fields tab in the configuration section in Kiplot to configure products and customers for your organization

New page to show all integration sync activity

  • Kiplot has implemented a new dedicated page to show all Integration Sync Activity to see what syncs have been executed and easily spot possible configuration errors

Ability to change the name of archived initiative types

  • Users can now modify the names of archived initiative types in the configuration section for initiatives and outcomes

Enhanced Report Visualizations

  • Kiplot now supports a broader range of colors in its reporting, providing greater flexibility for data visualization. This update is complemented by smoother, curved edges on visual elements.

23 September, 2024 (v5.5.3)

View dependencies between initiatives on the initiative roadmap

  • By applying the ‘Dependencies’ overlay on the initiative roadmap, users can now see visual mappings of dependencies set between initiatives

16 September, 2024 (v5.5.2)

Various Fixes:

  • Users can now represent 0 capex as ‘0’ instead of null (viewable in Initiative Financials).

  • Correct colors for ‘type’ on the portfolio kanban (viewable in Portfolio Kanban).

  • Last period’s activity in timesheets now visible by default (viewable in Time Tracking).